Skip to content
PoliTrackerPrototype - alpha version 0.1
← Policies

Proposed

Bill · 119th Congress · S 5199

GRID Savings Act of 2026

Refreshed 1 h ago

Introduced 2026-07-30Topic: energy

Summary

AI-generated summary, report an error

This bill would give the Federal Energy Regulatory Commission (FERC) authority over connecting large electricity users, defined as new or expanded nonresidential sites with peak demand of at least 150 megawatts, to the interstate transmission system. Within one year, FERC would have to issue a rule setting standards and procedures for these connections, including study timelines, cost classification, payment and financial security requirements, disclosure of costs, and reliability standards. Large-load customers would pay all costs of facilities built solely for their use, and they could choose to voluntarily fund regional transmission projects in exchange for transmission rights. The bill would not apply to transmission occurring wholly within the Texas ERCOT grid.

Full text and official record on Congress.gov

Sponsors

Action history

DateChamberActionStatus effect
2026-07-30SenateRead twice and referred to the Committee on Energy and Natural Resources.refer
2026-07-30Introduced in Senateintroduce
Source: GovInfo Bill Status (Library of Congress), fetched 2026-10-02. Provisions and opinion polling arrive in a later release.