Skip to content
PoliTrackerPrototype - alpha version 0.1
← Policies

Proposed

Bill · 119th Congress · HR 9806

FLOWS Act

Refreshed 32 min ago

Introduced 2026-07-21Topic: energy · environment · infrastructure utilities

Summary

AI-generated summary, report an error

This bill changes the Federal Power Act's rules for hydropower projects licensed by the Federal Energy Regulatory Commission (FERC). It would require FERC approval only for substantial changes to project works or operations, and would not require approval for routine maintenance, repair, or replacement, or for temporary changes caused by events outside the licensee's control. FERC would have to propose and then finalize rules defining these categories. The bill also creates a separate licensing process for small hydrokinetic projects of up to 5 megawatts that use waves, tides, currents, or free-flowing water without dams, with licenses of 10 to 20 years and a 1-year deadline for FERC decisions.

Full text and official record on Congress.gov

Sponsors

Action history

DateChamberActionStatus effect
2026-07-21HouseReferred to the House Committee on Energy and Commerce.refer
2026-07-21Introduced in Houseintroduce
2026-07-21Introduced in Houseintroduce
Source: GovInfo Bill Status (Library of Congress), fetched 2026-09-11. Provisions and opinion polling arrive in a later release.