Proposed
Bill · 119th Congress · HR 5264
SPEED for Broadband Infrastructure Act of 2025
Refreshed 3 h ago
Introduced 2025-09-10Topic: technology privacy · infrastructure utilities · environmentSummary
AI-generated summary, report an errorThis bill would change the Communications Act of 1934 so that certain projects to place and install communications facilities, such as wireless antennas, would not go through federal environmental reviews under the National Environmental Policy Act or historic preservation reviews under the National Historic Preservation Act. Covered projects include new facilities in public rights-of-way up to 50 feet tall (or 10 feet taller than nearby structures), replacements that are the same as or similar to existing facilities, small antennas, and site expansions of up to 30 feet. It would also exempt easements on federal property from these reviews if an easement was already granted for another communications or utility facility on the same property. The bill keeps the federal duty to evaluate radiofrequency exposure and keeps state and local zoning authority to the extent consistent with federal law.
Sponsors
- Craig A. Goldman Republican sponsor
- 0 cosponsors
Action history
| Date | Chamber | Action | Status effect |
|---|---|---|---|
| 2025-09-10 | House | Referred to the Committee on Energy and Commerce, and in addition to the Committee on Natural Resources, for a period to be subsequently determined by the Speaker, in each case for consideration of such provisions as fall within the jurisdiction of the committee concerned. | refer |
| 2025-09-10 | House | Referred to the Committee on Energy and Commerce, and in addition to the Committee on Natural Resources, for a period to be subsequently determined by the Speaker, in each case for consideration of such provisions as fall within the jurisdiction of the committee concerned. | refer |
| 2025-09-10 | Introduced in House | introduce | |
| 2025-09-10 | Introduced in House | introduce |